Categories supplied by A Chau: dry transformers, medium voltage panels, low voltage panels, compensator panels, ATS panels, DB panels and construction and installation of Busway conductor systems for the project.
Built on an area of nearly 15,000 m2 at Lot H7 - Ba Dinh Political Center - 22 Hung Vuong, the work is a part of the technical facility systems serving the National Assembly.
ACIT JSC is proud to be trusted and selected as a supplier and installer of medium voltage panels, dry transformers and low voltage panels for the National Assembly House project.
The total construction floor area is 36,080m2. The design is a combination of two main blocks with overlapped rectangles: 3-storey high podium with large area, 6-storey rectangular tower with a long rectangular shape, located from 4th floor to 9th floor. In addition, the building also has 2 basements with a capacity of 400 cars and 400 motorbikes.
The project was designed by Vietnam Investment Consulting and Construction Designing Joint Stock Company - CDC. The winning contractor is Hanoi Construction Corporation.
(ACIT News)